EverLine Coatings restored ActivSpace’s West Seattle parking lot with asphalt repair and striping while keeping tenant access open the entire time.
At ActivSpace in West Seattle, the parking lot needed a full range of pavement work, including asphalt repair, crack filling, sealcoating, and line striping. The challenge was that ActivSpace tenants rely on that same lot as their only access point to their units, so the project had to move forward without cutting off that access. With a limited timeframe to complete the work, the project manager needed a contractor who could coordinate closely with both the property’s project manager and onsite managers. ActivSpace chose EverLine Coatings and Services of Seattle because the company is local, offers all of the needed services under one roof, and has strong reviews.

Asphalt Repair, Crack Filling, Sealcoating, and Striping for a West Seattle Property
EverLine Coatings and Services of Seattle completed a full scope of pavement work at the property. The completed services included:
Coordinating Closely With ActivSpace to Work Around a Tight Schedule
Before work began, the project managers from EverLine Coatings and Services of Seattle and ActivSpace met to walk the parking lot together, discuss the planned repairs, and note any additional cracks or concerns. All updates identified during that walkthrough were added to the project scope. Once work started, the ActivSpace project manager was onsite for most of the project, and EverLine Coatings and Services of Seattle stayed in direct contact with her throughout, with constant updates by text and email whenever she wasn’t on site. Midway through the project, an unexpected issue came up: dust and dirt from a nearby railyard, kicked up by its own power washing, had covered the parking lot far more than anyone anticipated. Clearing it required over a day of additional power washing, which pushed the schedule back. EverLine Coatings and Services of Seattle let the client know right away that this wouldn’t keep the project off schedule, assured her they wouldn’t let her down and would take care of her, and completed the full project over three days.
A Parking Lot ActivSpace Can Rely On
Once the work was finished, the ActivSpace project manager was relieved to have the site completed, especially since it was the first of four ActivSpace locations planned and the most difficult given its size and the amount of repair needed. She noted the team’s dedication to quality and their commitment to completing every part of the job with the highest level of effort.
If your West Seattle property needs asphalt repair, crack filling, sealcoating, or striping without disrupting tenant access, contact EverLine Coatings and Services of Seattle to get started.