Hotel Parking Lot Restoration in Columbia, SC

EverLine Coatings Columbia sealcoated 55,000 square feet and restriped a hotel parking lot in five days while keeping the property fully operational for guests.

The hotel’s owner and general manager had recently finished interior and exterior renovations and were looking for a contractor to restore the parking lot. They wanted clear information on striping, crack filling, and sealcoating that would bring the property’s curb appeal up to the same standard as the updated building.

Hotel Parking Lot Restoration in Columbia SC

Bringing the Parking Lot Up to Par

Although the hotel had been refreshed inside and out, the asphalt surface showed signs of aging. Cracks extended through different areas of the lot, the pavement color had dulled, and existing markings had lost definition. The owners were referred to EverLine Coatings and selected the Columbia team because of reliable communication and a reputation for organized project delivery.

Clear Communication for Optimal Traffic Flow

The hotel remained open throughout the renovation work, which created scheduling and access needs that had to be managed carefully. Guest traffic, staff parking, and the surrounding property layout required a phased approach so operations could continue without disruption. Coordinating drying times, weather windows, and traffic flow planning was essential to keeping the project on track and ensuring the property remained safe for guests moving through the area.

Restoring and Revitalizing a Massive Lot

EverLine Coatings completed a full asphalt maintenance and repainting scope. The work included approximately 2,100 linear feet of asphalt crack filling, sealcoating of roughly 55,000 square feet of pavement, and a complete restripe of all traffic markings. Stalls, accessible spaces, hatching, arrows, and other directional elements were reapplied to establish a clean and functional layout.

Maintaining Operations While Repairing

The project took five full business days from start to finish. Owners and stakeholders received steady updates on the schedule, daily progress, and projected completion timeline. The team followed the EverLine CORE Quality System to ensure consistent preparation, application, and communication throughout each stage of the work. This allowed the hotel to plan around the activity and maintain normal operations while improvements were completed.

Results and Call to Actions

Once the sealcoat cured and the new markings were applied, the parking lot aligned with the hotel’s refreshed appearance and provided a stronger first impression for guests arriving on the property. The client was very pleased with the outcome and the professionalism of the crew. To learn more about how EverLine Coatings can help your business look its best, visit our service page.

Project Gallery

Request a Quote

Columbia, SC EverLine Office

Address:
844 Pepper Street
Columbia, SC 29209

Serving the Greater Columbia, SC Area, Including:

Request a Quote

Columbia, SC EverLine Office

Phone: (803) 409-8994

Address:
844 Pepper Street
Columbia, SC 29209

Contacts:
Sales Representative – Melissa Mimms

Serving the Greater Columbia, SC area, including: