These fresh new lines for this freshly paved bridge were completed by the EverLine Ottawa franchise.
The team completed this job as efficiently as possible while maintaining EverLine’s high standards of excellence. This allowed the bridge to reopen ASAP and reduced traffic disruption for the people in this community.